Display mode :
List
|
With picture and summary
|
Localization map
POMERLEAU brings its expertise and its expertise in processes to each one of its clients.
The competences POMERLEAU brings to the heavy industry sector are key factors in the successful delivery of major projects with technical and/or budgetary constraints or very precise detailed schedules.
Our industrial clients know that our greatest assets are our competence, our diligence, our experience and our drive to deliver a facility that meets all criteria.
Over the years, POMERLEAU has been a central figure on numerous large-scale industrial construction sites, particularly in Quebec.
Alouette Aluminium Plant
Pomerleau was mandated to perform the bulk of the civil engineering work for the construction of this new plant. The Alouette complex is composed of the following: dust extraction and smoke control facilities; alumina reclamation and distribution silos; paste plant; anode sealing; treatment of red ...
Complete details
CFA Copper Foil Sheet Production Plant
The CFA Production Centre in Granby, Quebec produces rolls of thin copper foil (ranging from 19 to 140 microns) used in the manufacture of electronic components. Particulars: Total area: 22,000 m2. Steel structure with open areas to accommodate overhead traveling cranes. Ground Floor: Slab on ...
Complete details
Magnola Magnesium Production Plant
Magnola extracts magnesium from mine tailings.Pomerleau was awarded the following contracts: Electrolysis facility A) 40,000 m2 of formwork and 18,000 m3 of concrete for the foundations and structure. B) Refractory concrete coating of the entire slab (5,576 m2), using an aluminium-based concrete ...
Complete details
Norsk-Hydro Magnesium Plant
As General Contractor, Pomerleau was mandated to construct 4 new plant buildings. The main building houses the process equipment and consists of a 7-storey superstructure of reinforced concrete. To complete this contract quickly within the 5-month schedule, the Pomerleau team employed jump works 9 ...
Complete details
Reynolds Primary Aluminium Plant
In 1984, Pomerleau did most of the civil engineering work required to construct 2 new tank rooms as well as several other buildings and allied work. 75,000 m3 of concrete were placed. In 1989, Reynolds awarded Pomerleau a series of contracts for: Design and construction: electrical power ...
Complete details
Back to top