General contracting and construction management
  • Français
  • Contact Us
  • Home
  • Search
Pomerleau
You are here : Buildings > Specialized expertise > Value Analysis

Value Analysis

Change text size Print this page Subscribe to RSS feed

Display mode : List | With picture and summary | Localization map


1000 de La Gauchetière

1000 de La Gauchetière

This high-rise is 51 stories tall and has a 5-level underground parking facility with space for 1,100 vehicles. The total surface area measures 153,300 m2. It includes an atrium with an indoor skating rink, an integrated amphitheatre and restaurants. The Montreal South Shore Transit (STRSM) ...

Complete details

Héma-Quebec Research Centre

Héma-Quebec Research Centre

Three-storey 9, 800 m2 medical research centre for transfusion and transplant technologies.First Floor Production:laboratories; 8 cold rooms,temperatures varying from -20ºC to +4ºC). Receiving and storage areas. Histo-Québec:Classes CL 100,000, CL10,000, CL 1,000 and CL 100 clean ...

Complete details

Hull Casino

Hull Casino

Pomerleau was responsible for managing the complete project, based on the client’s program, and delivering it within just over a year. Open to the public, the Casino has four levels and total surface area of 26,200 m2. There are 55 gaming tables, more than 1,700 slot machines, 2 bars (115 ...

Complete details

Lac-Leamy Tourist Complex

Lac-Leamy Tourist Complex

Pomerleau completed this high-stakes project on a 60,000 m2 site during a period of record activity for the construction industry in the National Capital Region of Canada. Meeting Unique Challenges: Extremely high standards of quality, environmental considerations and technical complexity within ...

Complete details

Notre Dame Cathedral

Notre Dame Cathedral

Originally constructed between 1841 and 1885, this Cathedral is a national historical site and a prominent Ottawa landmark. It also continues to be an active parish church, serving a regular congregation. The project’s main goals were the solidification of the structure and revitalization of ...

Complete details

Quebecor - Head Office (expansion)

Complete details

Sir Mortimer B. Davis Jewish General Hospital

Sir Mortimer B. Davis Jewish General Hospital

The enlargement of the Cummings Pavilion E and the Dialysis Unit has not only helped relieve overcrowding but also provided space for the new Comprehensive Cancer Centre, the new Cardiovascular Sciences Centre and 12 new dialysis stations. Pavilion E had to remain in continuous operation and ...

Complete details

Université de Montréal, Jean-Coutu and Marcelle-Coutu Pavilions

Université de Montréal, Jean-Coutu and Marcelle-Coutu Pavilions

Jean Coutu PavilionNow that this new pavilion (16,471 m2) is completed, the Faculty of Pharmacy can admit more undergraduate students and answer the increasing need for more pharmacists in the community, in health care institutions and in private industry. The Faculty will also be able to admit ...

Complete details

University of Montreal and École Polytechnique, J.-Armand-Bombardier Pavilion

University of Montreal and École Polytechnique, J.-Armand-Bombardier Pavilion

The University of Montreal and the École Polytechnique joined together to create this 5-storey pavilion dedicated to innovation and research. The project was also made possible by a donation from the J.-Armand Bombardier Foundation and contributions from the Quebec and Canadian governments. The J. ...

Complete details

Assurance-Vie Desjardins-Laurentienne Head Office

Assurance-Vie Desjardins-Laurentienne Head Office

The enlargement of this head office was accomplished by attaching a new building (6 stories plus a basement) to the existing building. The new building has a floor surface of approximately 7,155 m2 and its concrete structure is clad in concrete sandwich panels.Pomerleau also worked on the ground ...

Complete details

Carleton Consolidated School

The renovation and additions to this elementary school are benefiting from the Pomerleau team's solid experience in planning and project management, cost estimating, cost control, value engineering, scheduling and on-site coordination. Pomerleau's responsibilities consist of Project Management of ...

Complete details

Casiloc Warehouse and Office Complex

Casiloc Warehouse and Office Complex

At the end of November 2000, Pomerleau delivered this multifunctional Loto-Québec complex at the corner of Mill and Bridge Streets in Montreal. The complex (approx. 36,200 m2) includes five warehouses, workshops, the organization’s archives and several seminar rooms.Multi-level building with ...

Complete details

Provigo Head Office

Provigo Head Office

As Construction Manager, Pomerleau was responsible for delivering 3 buildings (total surface 30,000 m²), each with 3 stories and connected to its neighbour by an atrium, and a 2-level underground parking facility (12,500 m²). These buildings house the offices of some 1,200 employees ...

Complete details

R/D Tech Research Centre

R/D Tech Research Centre

World leader in the non-destructive testing of metal structures, R/D Tech moved to new facilities delivered by Pomerleau in 2002. Researchers occupy almost 70% of the new building. The rest houses a high-precision machining plant, offices, stores, two cafeterias and four conference rooms. It is ...

Complete details
Back to top
  • Extranet
  • Legal Notice
  • Site Map
  • Become a Supplier
  • What's New ?
Pomerleau
521, 6th Avenue
Saint-Georges, QC
Canada G5Y 0H1

Phone : 418-228-6688
Fax : (418) 228-3524
E-mail :

Website : www.pomerleau.ca
Printed on : March 12, 2010